• The Right Tools for the Job Save Time and Money

• Pool Checklist
• Seals, Waxes and Finishes
 
 
 
 
 
 
 
 

  1. Apply the finish at 70°F. (22°C.) +/- 10°F. (3°C.).
  2. Amop head (rayon or fine string) should be used for applying finish. It should not be used for any other purpose.
  3. Using a clean pail, with just enough finish for the job, insert mop into finish. Pull out and wring until finish will not drip from mop. This is the consistency with which finish should be applied.
  4. Allow 20 - 40 minutes between coats.
  5. Apply minimum 4-5 coats if sealer is not used.
  6. Although floor will be dry in 1-2 hours, it will not bond to the floor surface for 48-72 hours. Although traffic can be allowed after 2-3 hours, the less pressure applied, the better the finish surface will be.
 
 
At Cleaning Solutions we give you more than quality, we give you value.
For our full product listing please visit our Web Store™
© 2003 CG Maintenance & Sanitary Products. All rights reserved.